Precision CNC
Insulating Support Parts
Custom CNC machined insulating support components — PEEK, ceramic-adjacent metal seats, and PTFE structural parts. Assembly fit tolerance ±0.01 mm, electrical isolation ≥ 10¹⁰ Ω, cleanroom-compatible. For high-voltage zones, plasma systems, and electrostatically sensitive semiconductor equipment.
volume resistivity
metal-insulator interface
zero particle shedding
prototype orders
Insulating Support Component Challenges
Insulating support components must provide mechanical support and electrical isolation simultaneously — a combination of material properties, dimensional accuracy, and assembly protection that requires specialist machining expertise.
Insulating Support Components We've Made
Real CNC machined semiconductor components — cleaned, inspected, and cleanroom-packaged.
What We Can Deliver
Typical specifications — confirm exact requirements at enquiry.
| Electrical isolation | ≥ 10¹⁰ Ω volume resistivity (PEEK) |
| Assembly fit tolerance | ±0.01 mm metal-insulator interface |
| CTE compensation | Calculated per assembly temperature range |
| Min wall (PEEK) | 1.5 mm |
| Cleaning | Ultrasonic + UV particle inspect |
| Thread in PEEK | ISO metric, UNC — specified minimum torque |
| Materials | PEEK, PTFE, PI (Vespel), SUS316L, Al 6061 |
| Machining | Dedicated PEEK tools, no cross-contamination |
| Assembly kits | Metal + insulator matched and tested |
| Lead time (proto) | 7–10 days |
| Lead time (batch) | 12–18 days |
| Electrical test | Volume resistivity certificate available |
From Drawing to Cleanroom-Ready Part
Upload your drawing — DFM review, machining, cleaning, inspection, and cleanroom packaging within agreed lead time.
Trusted by Semiconductor Equipment Engineers
Frequently Asked Questions About Insulating Support Component Machining
Engineering and procurement questions answered by our semiconductor components team.
Send Your Drawing.
Get a Quote.
Every enquiry includes a DFM review — tolerance feasibility, material confirmation, and process approach confirmed before production starts. MOQ 1 piece.